Hill Park

Project location: Dahuichang Road (East), No. 6 Ring Road (West), Changxindian Town, Fengtai District, Beijing
Development period: 2013-2017
Project type: Resettlement house
Development type: Investment, development
  • 11.7 Land area: 0,000 ㎡
  • 30 Building area: 0,000 ㎡
  • 2.8 Floor area ratio
  • 3450 total of households
DemonstrationsHonorsCooperator
  • Quality model of indemnificatory housing
    Give full play to the geographical advantages of shallow mountainous areas, and plan the sloping lands and gardens.
  • Comfort model of indemnificatory housing
    Install the relocated households of old town shantytowns of Changxindian, allowing them to live in peace.
  • Model of energy conservation and environmental protection
    Design rainwater gardens by virtue of the sloping land conditions.
  • Great Wall Cup
    The project was awarded the "Gold Award in Beijing Great Wall Cup"。
  • National Excellent Engineering Survey and Design Award
    Third prize of outstanding garden and landscape engineering design award of 2017 national excellent engineering survey and design award
  • Plan and architectural design
    China Architecture Design & Research Group
  • Engineering, Procurement and Construction (EPC)
    The Third Construction Co., Ltd of China Construction First Group